Taiyuan Railway Station No. 3 Road, smooth down the power cord connected
8/31/2010 6:01:08 PM  Hit:1
[ Word size:Big Middle Small ]

PRC in mid- August , six from Central Railway Bureau Electric Works Group Corporation, Beijing Power Engineering Company Profile construction of stone is too off electricity reconstruction project in Taiyuan Taiyuan center hub for a third way power back then . The power lines down then the main power station in Taiyuan , is a load . Smooth down the power cord connected , to avoid power lines left the way the original power supply , the need to prepare the drawbacks of high-power generator , which greatly improves the power to ensure the Taiyuan Railway Station .

 

 

 

 

 

 

Author:Electric Cable Co., Ltd. Jiande City 10000
website:www.wanjia-ylm.cn
main product:booster cable?trouble light?power cord

Home | Profile | News | Products | New Products | Equipment | Order | Certificate | Contact | XML
CopyRight© 2003-2006 ZheJiang Wanjia Electric & Cable corporation All Rights Reserved Our main products:booster cable ,Trouble light,Power cord
Address:The South Bridge Industrial Zone,Meicheng Town,Jiande Citv,Zhejiang,311604 P.R.China
Address:The South Bridge Industrial Zone,Meicheng Town,Jiande Citv,Zhejiang,311604 P.R.China